Bankability assurance

One accountable chain around the Pasan reference: source the right supplier in China, measure the order before it ships and when it lands, and turn the data into a bankable report.

All services
All services
Independent measurement
Pre-Shipment MeasurementOn-Site Plant VerificationBankable Reporting
Sourcing & network
Module Sourcing & SupplyBecome a partner
Explore
Pasan SystemsRent a LabClient loginTalk to our team
At the factory in China · independent check

Pre-Shipment Measurement.
In China.
By Pasan.

We bring our own mobile lab to your supplier's factory in China and measure your modules before they ship, independently, while the goods are still unpaid and you still have leverage.

Pre-Shipment Measurementmobile lab at the factory · IV + EL · before loading
65.7%
Modules below nameplate, TÜV Rheinland 2025
−1.3%
Avg. shortfall since 2020, Fraunhofer ISE
China
We bring the lab to the factory
days
Accept / hold decision, not months
What we do

Our mobile lab goes to the factory.

We drive a Pasan mobile lab to your supplier's plant in China and measure a sample of your order before it ships: IV power plus EL imaging, against an independent, METAS-traceable reference. You get an accept or hold decision while the goods are still unpaid.

  • Howour own mobile lab, on site
  • Wherethe factory in China, before loading
  • MethodIV power + EL, statistical sample
  • Outputindependent accept / hold report
The Mobile Lab platform
Why it matters

The flash list is not your friend.

Since 2017 the numbers flipped. TÜV Rheinland's 2025 study found 65.7% of 519 modules below their nameplate, up from 28.3% a decade earlier; Fraunhofer ISE sees about 1.3% average shortfall since 2020. Your contract and your yield model assume the nameplate is real.

  • TÜV Rheinland 202565.7% of 519 modules below label
  • Same test, 2015/1628.3% below label
  • Fraunhofer ISE≈ −1.3% average since 2020
  • Your contract assumesnameplate watts
What a percent costs

On 100 MW, 1.5% is a power plant you never get.

A 1.5% shortfall on a 100 MW order is 1.5 MW you paid for that never produces, worth millions over 25 years. Once the modules are paid and shipped, clawing it back means counter-measurements, lawyers and freight across borders. Acting before the container closes is the cheap moment.

  • 100 MW at −1.5%1.5 MW phantom capacity
  • Over 25 yearsmillions in lost energy
  • Dispute after paymentmonths, cross-border
  • Check before shippingdays, on site
Talk to our service team

Check the next order before it ships.

Request a quotation