Bankability assurance

One accountable chain around the Pasan reference: source the right supplier in China, measure the order before it ships and when it lands, and turn the data into a bankable report.

All services
All services
Independent measurement
Pre-Shipment MeasurementOn-Site Plant VerificationBankable Reporting
Sourcing & network
Module Sourcing & SupplyBecome a partner
Explore
Pasan SystemsRent a LabClient loginTalk to our team
Independent reports · banks & insurers

Bankable Reporting

A folder of flash files is not something a bank can lend against. Send us IV and EL measurements from any Pasan machine and our metrology team turns them into an independent report, with a stated uncertainty budget, traceable to METAS, the kind banks, insurers and EPCs accept.

Bankable Reportingyour measurements · our reference · bankable report
Signed
By the Pasan metrology team
METAS
ISO/IEC 17025 traceability
k=2
Stated uncertainty, GUM-compliant
PDF
Bank and insurer ready
Raw data is not a report

Measurements become evidence when someone signs them.

Acquisition files prove you ran a test, not that the result is trustworthy. We take your IV and EL data, validate it against the Pasan reference, attach a measurement-uncertainty budget so every number carries its confidence interval, and present it the way a credit committee reads it. The same engine behind our uncertainty tool produces the budget, GUM-compliant, k=2, defensible.

  • You sendIV + EL from any Pasan machine
  • We addvalidation + uncertainty budget
  • Stated asU(Pmax), k=2, per GUM
  • Read bycredit & risk committees
Independent and traceable

Our name on it, not the manufacturer's.

The value of a third-party report is exactly its independence. Every Pasan report is referenced to the Pasan standard with traceability to METAS, the Swiss federal metrology institute, and signed by the metrology team in Neuchâtel, who did not sell you the modules and have no reason to flatter them. That is what makes the number hold in an acceptance milestone, an insurance claim or a dispute.

  • ReferencePasan · METAS-traceable
  • StandardISO/IEC 17025 practice
  • Signed inNeuchâtel, Switzerland
  • Independent ofthe module supplier
Built for who finances the plant

A document that moves money.

Banks release tranches against acceptance. Insurers price risk against evidence. EPCs argue tolerances against numbers. A Pasan report is written to do that work: to tie a payment milestone to a measured result, to support a transport-damage claim, or to settle a power-tolerance dispute, with a defensible figure instead of a flash list.

  • Tiespayment milestones to results
  • Supportsinsurance & warranty claims
  • Settlespower-tolerance disputes
  • Audiencebanks · insurers · EPC · developers
Talk to our service team

Turn your measurements into a bankable report.

Request a quotation