PV measurement, application by application
Each page states the measurement problem, the physics, the requirements, the applicable IEC standards and the advantages and limitations of each light source, with published evidence cited next to the claims it supports.
Thin film
Measuring First Solar CdTe modules (Series 4, 6 and 7): what the evidence says
Measuring a First Solar CdTe module accurately is mainly a preconditioning problem, not a light-source problem: the module's power depends on its recent light, bias and temperature history by several percent, so it must be stabilised under controlled conditions (IEC 61215-1-2, or a current-injection procedure validated against light) and measured at a fixed delay, against a CdTe reference or with a full IEC 60904-7 spectral mismatch correction; once the module is in a defined state, the published evidence shows no accuracy advantage of steady-state light or long pulses for the I-V itself.
What a solar simulator needs to measure cadmium telluride (CdTe) modules
A solar simulator for CdTe modules needs less pulse length than one for capacitive silicon and more care elsewhere: a measured spectrum for IEC 60904-7 mismatch correction (CdTe responds only up to about 900 nm), a matched CdTe reference module or a corrected silicon reference, an electronic load for high-voltage modules, temperature control, and a way to precondition the module reproducibly before the flash, by light soaking or by a validated current-injection sequence.
Thin-film PV module measurement: CdTe, CIGS and amorphous silicon
Thin-film modules differ from crystalline silicon in three ways that decide a measurement: each technology has its own stabilisation (light-induced degradation for amorphous silicon, reversible metastability for CdTe and CIGS), their spectral responses differ strongly from a silicon reference so mismatch must be corrected, and amorphous silicon, unlike CdTe and CIGS, shows sweep-time effects.
Measuring CIGS modules: metastability, preconditioning and current injection
CIGS modules change their I-V characteristics with recent light, heat and bias, and lose power in the dark (the dark-soak effect named in IEC 61215-1-4); a reproducible measurement therefore needs controlled preconditioning followed by a prompt flash, and NREL found that forward-bias current injection held CIGS modules within 1 % while unbiased modules drifted by up to 12 %.
Crystalline silicon
Measuring heterojunction (HJT, SHJ) cells and modules without capacitive error
Heterojunction cells store so much charge that an I-V sweep faster than the device can follow splits the forward and reverse curves and biases the maximum power, by more than 20 % in extreme cases of fast sweeps; a valid HJT measurement must be shown equivalent to steady state (IEC 60904-1:2020), typically by forward and reverse sweeps that agree, using a long enough pulse, a multi-flash or shaped-voltage method, or steady-state light.
Measuring TOPCon modules: capacitance, UV-induced degradation and metastability
TOPCon modules need two precautions on a flasher: an acquisition slow enough to be free of capacitive hysteresis, verified by forward and reverse sweeps, and, after UV exposure or dark storage, a short defined light soak right before the flash, because part of their UV-induced loss grows in the dark and recovers within minutes under light.
Measuring back-contact and IBC cells and modules
Back-contact and IBC devices are high-efficiency, long-lifetime cells that the JRC industry guidelines class with heterojunction as highly capacitive, so their I-V must be shown equivalent to steady state; at cell level, the rear contacting and measurement conditions alone can change the measured efficiency by up to 0.5 % absolute.
Bifacial PV module measurement to IEC TS 60904-1-2
A bifacial module is rated with front-only STC values, its bifaciality coefficients and its power at bifacial nameplate irradiance (1000 W/m² front plus 135 W/m² rear); IEC TS 60904-1-2 (2024 edition) allows a single-side method at equivalent irradiance, which needs a simulator adjustable above 1000 W/m² with class B uniformity or better at those levels, and limits stray light on the non-illuminated side to 5 W/m².
Emerging and tandem
Measuring perovskite solar cells and modules: stabilised power, not a fast I-V
Perovskite devices respond to light and voltage over seconds to minutes because mobile ions redistribute, so a fast I-V scan is a snapshot of a non-steady state that can widely misestimate current and efficiency; the defensible quantity is the stabilised maximum power under continuous illumination, reported with the preconditioning and scan conditions, and stability is tested with the ISOS protocols.
Measuring perovskite-silicon and other tandem devices
In a two-terminal tandem the subcells are in series, so the current is set by whichever junction limits under the test spectrum; the simulator spectrum must therefore be adjusted, using the spectral responsivity of each junction (IEC 60904-8-1) and one reference device per junction, until each subcell generates its AM1.5G current (IEC 60904-1-1), and the perovskite top cell then needs a steady-state power measurement.
Method
Short pulse, long pulse, multi-flash or steady state: which solar simulator mode for which device
Choosing a simulator mode answers two separate questions: is the I-V acquisition slow enough to be equivalent to steady state for this device (a matter of capacitance for high-efficiency silicon, of ionic transients for perovskite), and has the device been preconditioned into a defined state (a matter of hours of light or bias for thin film and metastable silicon)? A long pulse answers the first question, never the second.
Light soaking, metastability and preconditioning of PV modules
Light soaking exposes a module to controlled light under load until its power stops changing, so that a rating describes a defined state; IEC 61215 sets the criterion per technology (for crystalline silicon at least 10 kWh/m² in two intervals and a 1 % criterion), thin-film and perovskite devices need more care because their state also depends on temperature, bias and dark time, and current injection is acceptable only once validated against light.
Spectral mismatch correction (IEC 60904-7): formula, data and uncertainty
The spectral mismatch factor of IEC 60904-7 corrects a measurement when the device under test and the reference device respond differently to a simulator spectrum that differs from AM1.5G; it needs the relative spectral responsivities of both and the simulator spectrum in the test plane, it is valid only for that combination, and even silicon measured against silicon on class AAA simulators has shown corrections of about 2 %, with an uncertainty of 0.06 % to 1.26 % (k = 2) depending on correlations.
Spatial non-uniformity of irradiance: class versus actual error
Spatial non-uniformity is (max - min) / (max + min) of irradiance over the test area, graded A+ (1 %), A (2 %), B (5 %) or C (10 %) by IEC 60904-9:2020; the class is a bound, not the error on a module's power, which depends on the pattern relative to the cell layout, the cells' shunt resistance and how the reference is calibrated, and IEC 60904-9 notes that a wide range of non-uniformity often produces errors below 1 %, case by case.
High-accuracy PV power measurement: what actually limits it
The accuracy of a module power measurement is limited by a few terms whose sizes are published: the calibration of the reference device (0.23 to 0.4 % at the primary level, k = 2), spectral mismatch, non-uniformity, capacitive error ((0.47 ± 0.19) % residual with step-like methods), preconditioning for thin film, and temperature; the best accredited module calibrations today state about ±1.1 %, and neither a repeatability figure nor a simulator class measures accuracy.
Laboratory and traceability
Reference module calibration and the PV traceability chain
Every module power measured on a simulator is only as good as the reference device that set the irradiance, whose calibration runs from SI radiometry through primary reference cells (best published 0.23 to 0.4 %, k = 2) to secondary and working references (IEC 60904-4:2019); a production reference module should be of the product type, stabilised, and re-checked against traceable references at least yearly.
What ISO/IEC 17025 requires of a PV testing or calibration laboratory, and of its solar simulator
ISO/IEC 17025:2017 accredits a laboratory for a defined scope, never an instrument: for the solar simulator it requires calibrated, traceable equipment (clauses 6.4 and 6.5), validated methods (7.2), an evaluated measurement uncertainty (7.6) and ongoing checks such as proficiency tests (7.7), so the useful questions to a supplier are whether every part of the measurement chain can be calibrated externally and documented.
Measurement uncertainty and traceability in PV: repeatability, reproducibility, uncertainty
Repeatability is the agreement of successive measurements under identical conditions, reproducibility the agreement across laboratories, instruments or time, and measurement uncertainty the range in which the true value reasonably lies, evaluated with the GUM and anchored by traceability to the SI; IEC 61215 uses reproducibility and uncertainty limits per technology (for crystalline silicon r = 1.0 % and m1 = 3.0 %), and a 0.05 % repeatability says nothing about a module's absolute error.
Production and field
Production-line solar simulation: rating every module at line speed
A production flasher must rate every module in seconds with results traceable to an accredited laboratory; IEC TR 60904-14:2020 gives the guidelines, reference modules of the product type keep the line correlated, label tolerances have narrowed to a common -0/+3 %, and capacitive HJT, TOPCon and back-contact products need a long or shaped pulse to stay correct at line speed.
Measuring power for PV module degradation and reliability testing
Qualification and extended stress tests decide pass or fail on power changes of a few percent between measurements weeks apart, so the decision is only as good as the repeatability of the intermediate measurement and the consistency of stabilisation before each flash; IEC 61215 sets reproducibility and uncertainty limits per technology (c-Si r = 1.0 %, m1 = 3.0 %), and TOPCon UV metastability shows how an uncontrolled delay turns into apparent degradation.
On-site module testing for utility-scale PV plants
On site, module power can be checked outdoors with I-V tracers and translation to STC (IEC 61829) or with a mobile indoor flasher, to which the laboratory requirements of IEC 60904-1 and -9 apply unchanged; electroluminescence finds defects but does not measure power (IEC TS 60904-13), and no peer-reviewed comparison of mobile and accredited laboratory uncertainty was found, so a mobile result should carry the operator's own budget.